UET60221 Advanced Diploma of
ESI - Power Systems
UET60222 Advanced Diploma of
ESI - Power Systems
For UET60222 Design Specialization (Group B)
Core Units |
See UET60221 |
||||||||||||||||||||||||||||||||||||||||||||||||
1/UEECS0033 Use engineering
applications software on personal computers |
UEENEED104A Use engineering
applications software on personal computers http://www.iqytechnicalcollege.com/advdipit.htm |
||||||||||||||||||||||||||||||||||||||||||||||||
2/UETDRDS015 Assess
distributed energy resource connections to a distribution network |
UETDRTS015
Maintain complex network protection and control systems https://www.nature.com/articles/srep24456 www.iqytechnicalcollege.com/srep02764.pdf |
||||||||||||||||||||||||||||||||||||||||||||||||
3/UETDRDS017 Design
customer substations |
UETDRTS017 Maintain
interdependent network protection and control systems https://ietresearch.onlinelibrary.wiley.com/doi/full/10.1049/gtd2.12177 www.iqytechnicalcollege.com/S017.pdf https://www.pdfdrive.com/protection-of-electrical-networks-d33483131.html http://www.iqytechnicalcollege.com/Protection
of Electrical Networks ( PDFDrive ).pdf https://www.pdfdrive.com/electric-power-system-planning-d39893329.html www.iqytechnicalcollege.com/Electric-Power-System-Planning-Issues-and-Algorithms-and-Solutions.pdf |
||||||||||||||||||||||||||||||||||||||||||||||||
4/ UETDRDS018 Design distribution protection systems |
IS68+74
www.highlightcomputer.com/G015-AE
Mod.zip
G015(AA)Lesson 6-Voltage control.zip G015(AE)Lesson 1-Power system protection
scheme.zip G015(AE)Lesson 2-Differential relay.zip G015(AE)Lesson_3-Over_current_&_earth_fault_protection.zip G015(AE)Lesson 4-Three phase differential
relay.zip G015(AE)Lesson 5-Current time grading.zip G015AE Lesson 6 G015(AE)Lesson 8-Distance relay.zip G015(AE)Lesson 9-Telecom in power
protection.zip |
||||||||||||||||||||||||||||||||||||||||||||||||
5/ UETDRDS019 Design distribution substations |
Power system 2-G037+G038+G039.zip G037+G038+G039
Part 1/2/3+IS69 Page 232 to 270 www.highlightcomputer.com/Video Lessons.pdf Power System (2) G037+G038+G039 Lesson 1-Power Flow.zip G037+G038+G039 Lesson 2-Site Earthing.zip G037+G038+G039 Lesson 3-Power System
Control Equipments.zip G037+G038+G039 Lesson 4-Auxiliary
System+Harmonic.zip G037+G038+G039 Lesson 5-Harmonic.zip G037+G038+G039 Lesson 6-Harmonic
Calculation.zip G037+G038+G039 Lesson 7-Synchronous
Generator Loading.zip G037+G038+G039 Lesson 8-Turbine Control+Power Line Earthing.zip G037+G038+G039 Lesson 9-Insulator.zip G037+G038+G039 Lesson 10-Reliability of
Power System.zip G037+G038+G039 Lesson 11-Harmonic
Reduction.zip G037+G038+G039 Lesson 12-Grounding + Power
Quality.zip G037+G038+G039 Lesson 13-Power Quality.zip G037+G038+G039 Lesson 14-Harmonic
Model.zip G037+G038+G039 Lesson 15-Harmonic Losses
in Transformer.zip G037+G038+G039 Lesson 16-Reliability
Improvement.zip G037+G038+G039 Lesson 17-Preparation for
emergency.zip G037+G038+G039 Lesson 18-Harmonic
problems.zip G037+G038+G039 Lesson 19-Synchronous
machine problems.zip G037+G038+G039 Lesson 20-Power Generation
+ Generator Control.zip G037+G038+G039 Lesson 21-Turbine Control+
Digital Excitation.zip G037+G038+G039 Lesson 22-Power System
Protection.zip G037+G038+G039 Lesson 23-Switch Gear.zip The links contain the following lessons G037+G038+G039 Lesson 1-Power Flow G037+G038+G039 Lesson 2-Site Earthing G037+G038+G039 Lesson 3-Power System Control Equipments G037+G038+G039 Lesson 4-Auxiliary System+ Harmonic G037+G038+G039 Lesson 5-Harmonic G037+G038+G039 Lesson 6-Harmonic Calculation G037+G038+G039 Lesson 7-Synchronous Generator Loading G037+G038+G039 Lesson 8-Turbine Control+ Power Line Earthing G037+G038+G039 Lesson 9-Insulator G037+G038+G039 Lesson 10-Reliability of Power System G037+G038+G039 Lesson 11-Harmonic Reduction G037+G038+G039 Lesson 12-Grounding + Power Quality G037+G038+G039 Lesson 13-Power Quality G037+G038+G039 Lesson 14-Harmonic Model G037+G038+G039 Lesson 15-Harmonic Losses in Transformer G037+G038+G039 Lesson 16-Reliability Improvement G037+G038+G039 Lesson 17-Preparation for emergency G037+G038+G039 Lesson 18-Harmonic problems G037+G038+G039 Lesson 19-Synchronous machine problems G037+G038+G039 Lesson 20-Power Generation + Generator Control G037+G038+G039 Lesson 21-Turbine Control+ Digital Excitation G037+G038+G039 Lesson 22-Power System Protection G037+G038+G039 Lesson 23-Switch Gear |
||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||
6/ UETDRDS020 Design overhead distribution systems 7/ UETDRDS022 Design underground distribution systems |
www.highlightcomputer.com/G015-AA
Mod.zip G015/
IS67+68+ IS74 Page 196 to 231 of www.highlightcomputer.com/Video Lessons.pdf Power System (1) G015(AA)Lesson 1-Distribution system.zip G015(AA)Lesson 2-Demand factor.zip G015(AA)Lesson 4-OH Line mechanical
design.zip G015(AA)Lesson 6-Voltage control.zip |
||||||||||||||||||||||||||||||||||||||||||||||||
8/ UETDRDS028 Prepare and manage construction plans for
electrical infrastructure |
E011+E117+E071+G169+G170 Projectplanning+management+Risk+OHS. G069+G070+E071+E011+E017.zip
www.highlightcomputer.com/E01124G069G070Mod.zip Project+Risk-E011+E017+G070+G069 Project
Specification+ Variation Risk Management Project Risk
Assessment and Management http://www.mongroupsydney1.com/Electrical_Risk_Assessment.pdf Project Management +Specification Delivery &
Assessment Plan http://www.mongroupsydney1.com/ProjectManagementSpecificationDeliveryandAssessmentPlan.doc Project
Management
E071+G069+G070 + G169+G170 Page 102 to 127 of www.highlightcomputer.com/Video Lessons.pdf Project
Specifications+ Project Planning The links contain the following lessons E071+G069+G070 Lesson 1 Project management planning E071+G069+G070 Lesson 2 NSW service rule+Marketing E071+G069+G070 Lesson 3+4 Contract planning + HV conductor E071+G069+G070 Lesson 5 Project modelling E071+G069+G070 Lesson 6 Job planning E071+G069+G070 Lesson 7 Line infrastructure + Material planning E071+G069+G070 Lesson 8 Problem solving and decision making E071+G069+G070 Lesson 9 Control of project+Maintenance specialist
work E071+G069+G070 Lesson 10 Contract bid work E071+G069+G070 Lesson 11 Project structure E071+G069+G070 Lesson 12 Analysing plan+ Insurance E071+G069+G070 Lesson 13 Modelling project E071+G069+G070 Lesson 14 Project costing+Contracting paper
work E071+G069+G070 Lesson 15 Change control E071+G069+G070 Lesson 16 Management leadership+Job accounting E071+G069+G070 Lesson 17 Management thinking+Contract management
planning |
||||||||||||||||||||||||||||||||||||||||||||||||
9/ UETDREL005 Work safely in the vicinity of live
electrical apparatus |
Electricity Supply Industry Safety UET60221 |
http://www.iqytechnicalcollege.com/UET60221
Advanced Diploma of ESI - Power Systems.htm
UET Training Package
https://www.iqytechnicalcollege.com/UET_R3.0.pdf
CORE (820)
UEENEED104A Use engineering applications software on
personal computers
http://www.iqytechnicalcollege.com/advdipit.htm
UEENEEE083A Establish and follow a competency development plan
in an electrotechnology engineering discipline
E083
Electro-technology Competency Development
E083 Electro-technology Competency Development
(Electronics)
UEENEEE101A Apply Occupational Health and Safety
regulations, codes and practices in the workplace 20
UEENEEE102A
Fabricate, assemble and dismantle utilities industry components
UEENEEE104A Solve
problems in d.c. circuits
UEENEEE107A Use drawings, diagrams, schedules, standards,
codes and specifications
UEENEEG101A Solve problems in electromagnetic devices and
related circuit
UEENEEG102A Solve problems in low voltage a.c. circuits
http://www.highlightcomputer.com/electricaltrade2022.htm
UEENEEG149A Provide engineering solutions to problems in
complex polyphase power circuits
Power
Circuit Analysis
G049+G149
Page 363 to 373 of
www.highlightcomputer.com/Video Lessons.pdf
Three phase system
G049 Lesson 1 Basic three phase circuit.zip
G049 Lesson 2 Three phase star delta.zip
G049 Lesson 3 Three phase power
measurement.zip
G049 Lesson 4 Three phase 4 wires unbalanced
load.zip
G049 Lesson 5 Three phase 3 wires
unbalanced load.zip
G049 Lesson 6 Three phase power by 2 watt
meters.zip
G049 Lesson 7 Three phase fault.zip
G049 Lesson 8 Three phase fault calculation
table.zip
G049 Lesson 9 Fault calculation.zip
G049 Lesson 10 Sequence network.zip
The links contain the following lessons
G049 Lesson 1 Basic three phase circuit
G049 Lesson 2 Three phase star delta
G049 Lesson 3 Three phase power measurement
G049 Lesson 4 Three phase 4 wires unbalanced load
G049 Lesson 5 Three phase 3 wires unbalanced load
G049 Lesson 6 Three phase power by 2 watt meters
G049 Lesson 7 Three phase fault
G049 Lesson 8 Three phase fault calculation table
G049 Lesson 9 Fault calculation
G049 Lesson 10 Sequence network
G149 |
E125+G149
www.highlightcomputer.com/Circuit
G048E025G049-Mod.zip
|
|
Electrical
Circuits II
E025/
G048/ E125
Page 14 to 25 of
www.highlightcomputer.com/Video Lessons.pdf
http://www.filefactory.com/file/cf8775d/n/E025.zip
The links contain the following lessons
E025 Lesson 1 Resonance
E025 Lesson 2 Non sinusoidal Circuits
E025 Lesson 3 Pulse Waveform+RC Response
E025 Lesson 4 Transformer
E025 Lesson 5 Decibel+Filter
E025 Lesson 6 Filter+Bode Plot
Power circuit analysis
G048 Lesson 1 Mesh analysis+Source conversion.zip
Mesh
Analysis
Source
Conversion
G048 Lesson
2 Thevenin Theorem.zip
G048 Lesson 3 Nodal Analysis.zip
G048 Lesson 4 Superposition Theorem.zip
G048 Lesson 5 AC Network Analysis.zip
G048 Lesson 6 Transient Circuit.zip
The links contain the following lessons
G048 Lesson 1 Mesh analysis+ Source conversion
G048 Lesson 2 Thevenin Theorem
G048 Lesson 3 Nodal Analysis
G048 Lesson 4 Superposition Theorem
G048 Lesson 5 AC Network Analysis
G048 Lesson 6 Transient Circuit
UEENEEE126A Provide solutions to basic engineering
computational problems
E126+127
Maths 1-E050+G047.zip
|
|
www.highlightcomputer.com/Maths1E050G047Mod.zip
www.iqytechnicalcollege.com/Maths
2-E026 Mod.zip
|
|
Engineering Maths Calculus Textbook
Engineering
Mathematics II
E026/E127
Page 26 to 50 of
www.highlightcomputer.com/Video Lessons.pdf
E026
Lesson 1 to 5
The links contain the following lessons
E026 Lesson 1-Fourier
https://www.youtube.com/watch?v=QzYO2qCJGNg
E026 Lesson 2-Differential equation
E026 Lesson 3-Gamma+Beta Function
E026 Lesson 4-Vector analysis
E026-Lesson 5-Laplace Transform
Links
E026 Harmonic
Exercises
https://www.youtube.com/watch?v=VSdug1mECDE
E026 Definite Integral
https://www.youtube.com/watch?v=oal27HPNvhA
E026 Harmonics
https://www.youtube.com/watch?v=yFM7ajxKnXw
E026 Multiple Integral
E026-Lesson 6-Inverse Laplace+ Differential equation solution
E026-Lesson 7-Matrices
E026-Lesson 8 Legendre Function
E026-Lesson 9 Binomial Theorem+ Partial Differential equation
E026-Lesson 10 Multiple Integral
UEENEEE124A Compile and produce an energy sector detailed
report
UETDREL001 Apply environmental requirements
UETDRIS005 Implement & monitor power system environmental
& sustainable energy management policies & procedures
http://www.iqytechnicalcollege.com/electricaltrade2022.htm#K142A
UETDREL005 Work safely in the vicinity of live electrical
apparatus
UETDRIS006 Implement and monitor the power system organisational WHS/OHS policies, procedures and programs
Electricity
Supply Industry Safety
ELECTIVE (1410/ 1340)
Group B (200)
UEENEEG006A Solve problems in single and three phase low
voltage machine (80)
http://www.highlightcomputer.com/electricaltrade2021.htm#G006
143+G144+G145
Elect Machine-G043+G044+G045.zip
www.highlightcomputer.com/Elect
Machine-G043G044G045 Mod.zip
http://highlightcomputergroup4.zoomshare.com/files/G043_G045_Part_1.zip
http://highlightcomputergroup4.zoomshare.com/files/G043_G045_Part_2.zip
http://highlightcomputergroup4.zoomshare.com/files/G044_G010.zip
http://www.filefactory.com/file/c0b6668/n/Elect_Machine-G043_G044_G045.zip
AC
Machines
G043+G045+
G143+145+I145
Page 308 to 329 of
www.highlightcomputer.com/Video Lessons.pdf
Induction and synchronous machines & control
G043+G045 Lesson 1 AC Machine
Introduction.zip
G043+G045 Lesson 2 Slip+Equivalent Ckt.zip
G043+G045 Lesson 3 Power Transfer.zip
G043+G045 Lesson 4 Test for equivalent
ckt.zip
G043+G045 Lesson 5 Equivalent Ckt Problems.zip
G043+G045 Lesson 6 Motor starting and
control.zip
G043+G045 Lesson 7 Synchronous machine
introduction.zip
G043+G045 Lesson 8 Synchronous
machine ckt problems.zip
G043+G045 Lesson 9 Synchronous machine
starting.zip
G043+G045 Lesson 10 Single phase motor.zip
G043+G045 Lesson 11 Factors affecting motor
operation.zip
The links contain the following lessons
G043+G045 Lesson 1 AC Machine Introduction
G043+G045 Lesson 2 Slip+Equivalent Ckt
G043+G045 Lesson 3 Power Transfer
G043+G045 Lesson 4 Test for equivalent ckt
G043+G045 Lesson 5 Equivalent Ckt Problems
G043+G045 Lesson 6 Motor starting and control
G043+G045 Lesson 7 Synchronous machine introduction
G043+G045 Lesson 8 Synchronous machine ckt problems
G043+G045 Lesson 9 Synchronous machine starting
G043+G045 Lesson 10 Single phase motor
G043+G045 Lesson 11 Factors affecting motor operation
DC
Machines
G044+G144+I146
Page 330 to 343 of
www.highlightcomputer.com/Video Lessons.pdf
DC Machine and control
G044 Lesson 1 DC Machine Principle.zip
G044 Lesson 2 DC Winding +Armature
reaction.zip
G044 Lesson 3 Factors affecting speed &
direction of rotation.zip
G044_Lesson_4_Torque_speed_relation.zip
G044 Lesson 5 Losses & efficiency of DC
machine.zip
G044 Lesson 6 Machine temperature rise.zip
G044 Lesson 7 DC motor control.zip
G044 Lesson 8 Duty cycle+DC motor
starter.zip
G044 Lesson 9 DC motor speed control.zip
The links contain the following lessons
G044 Lesson 1 DC Machine Principle
G044 Lesson 2 DC Winding +Armature reaction
G044 Lesson 3 Factors affecting speed & direction of rotation
G044 Lesson 4 Torque speed relation
G044 Lesson 5 Losses & efficiency of DC machine
G044 Lesson 6 Machine temperature rise
G044 Lesson 7 DC motor control
G044 Lesson 8 Duty cycle+DC motor
starter
G044 Lesson 9 DC motor speed control
Group D
UETTDRIS69 Diagnose and rectify faults in energy supply
apparatus (60)
Electrical
Power Systems II
G037+G038+G039
Part 1/2/3+IS69
Page 232 to 270
www.highlightcomputer.com/Video Lessons.pdf
Power System (2)
G037+G038+G039 Lesson 1-Power Flow.zip
G037+G038+G039 Lesson 2-Site Earthing.zip
G037+G038+G039 Lesson 3-Power System Control
Equipments.zip
G037+G038+G039 Lesson 4-Auxiliary System+Harmonic.zip
G037+G038+G039 Lesson 5-Harmonic.zip
http://www.filefactory.com/file/c386dbc/n/G037+G038+G039_Lesson_5-Harmonic.zip
G037+G038+G039 Lesson 6-Harmonic Calculation.zip
G037+G038+G039 Lesson 7-Synchronous
Generator Loading.zip
G037+G038+G039 Lesson 8-Turbine Control+Power Line Earthing.zip
G037+G038+G039 Lesson 9-Insulator.zip
G037+G038+G039 Lesson 10-Reliability of
Power System.zip
G037+G038+G039 Lesson 11-Harmonic Reduction.zip
G037+G038+G039 Lesson 12-Grounding + Power
Quality.zip
G037+G038+G039 Lesson 13-Power Quality.zip
G037+G038+G039 Lesson 14-Harmonic Model.zip
G037+G038+G039 Lesson 15-Harmonic Losses in
Transformer.zip
G037+G038+G039 Lesson 16-Reliability
Improvement.zip
G037+G038+G039 Lesson 17-Preparation for
emergency.zip
G037+G038+G039 Lesson 18-Harmonic
problems.zip
G037+G038+G039 Lesson 19-Synchronous machine
problems.zip
G037+G038+G039 Lesson 20-Power Generation +
Generator Control.zip
G037+G038+G039 Lesson 21-Turbine Control+
Digital Excitation.zip
G037+G038+G039 Lesson 22-Power System
Protection.zip
G037+G038+G039 Lesson 23-Switch Gear.zip
The links contain the following lessons
G037+G038+G039 Lesson 1-Power Flow
G037+G038+G039 Lesson 2-Site Earthing
G037+G038+G039 Lesson 3-Power System Control Equipments
G037+G038+G039 Lesson 4-Auxiliary System+ Harmonic
G037+G038+G039 Lesson 5-Harmonic
G037+G038+G039 Lesson 6-Harmonic Calculation
G037+G038+G039 Lesson 7-Synchronous Generator Loading
G037+G038+G039 Lesson 8-Turbine Control+ Power Line Earthing
G037+G038+G039 Lesson 9-Insulator
G037+G038+G039 Lesson 10-Reliability of Power System
G037+G038+G039 Lesson 11-Harmonic Reduction
G037+G038+G039 Lesson 12-Grounding + Power Quality
G037+G038+G039 Lesson 13-Power Quality
G037+G038+G039 Lesson 14-Harmonic Model
G037+G038+G039 Lesson 15-Harmonic Losses in Transformer
G037+G038+G039 Lesson 16-Reliability Improvement
G037+G038+G039 Lesson 17-Preparation for emergency
G037+G038+G039 Lesson 18-Harmonic problems
G037+G038+G039 Lesson 19-Synchronous machine problems
G037+G038+G039 Lesson 20-Power Generation + Generator Control
G037+G038+G039 Lesson 21-Turbine Control+ Digital Excitation
G037+G038+G039 Lesson 22-Power System Protection
G037+G038+G039 Lesson 23-Switch Gear
IS69
www.highlightcomputer.com/G015-AG
Mod.zip
http://www.filefactory.com/file/c0b7f21/n/AG.zip
www.highlightcomputer.com/A010Mod.zip
http://www.filefactory.com/file/c0b7f3c/n/A010.zip
Power system 2-G037+G038+G039.zip
UETDRSO006 Develop low voltage distribution switching
programs (150)
UEPOPS428B - Develop H.V. switching programs
HIGH
VOLTAGE SWITCHING.
www.mongroupsydney1.com/highvoltageswitching.htm
UEPOPS456A
Session 1+2 Marine Power
Generation
Session 9 Risk
Management Leadership
Session 15+16 Energy
Supply-Operational status
Group E
UETTDRIS73 Develop engineering solutions for energy supply
power transformer problems (60)
IS73
www.highlightcomputer.com/G040Mod.zip
http://www.filefactory.com/file/4irnnoqadrzb/G040Lessons.zip
Power
Transformers
G040 +
IS73
Page 271 to 284 of
www.highlightcomputer.com/Video Lessons.pdf
G040 Lesson 1 Power transformer rating 1.zip
G040 Lesson 1 Power transformer rating 2.zip
G040 Lesson 2 Open circuit short circuit
test.zip
G040 Lesson 3 Transformer regulation.zip
G040 Lesson 4 Power transformer
connection.zip
G040 Lesson 5 Maximum efficiency.zip
G040 Lesson 6 Transformer parallel
operation.zip
G040 Lesson 7 Harmonic in transformer.zip
G040 Lesson 8 Transformer problem + auto
transformer.zip
G040_Lesson_9_Transformer_rating_cooling_connection_tap_changing.zip
G040 Lesson 10 Phase shift transformer.zip
The links contain the following lessons
G040 Lesson 1 Power transformer rating 1
G040 Lesson 1 Power transformer rating 2
G040 Lesson 2 Open circuit short circuit test
G040 Lesson 3 Transformer regulation
G040 Lesson 4 Power transformer connection
G040 Lesson 5 Maximum efficiency
G040 Lesson 6 Transformer parallel operation
G040 Lesson 7 Harmonic in transformer
G040 Lesson 8 Transformer problem + auto transformer
G040 Lesson 9 Transformer rating cooling
connection tap changing
G040 Lesson 10 Phase shift transformer
UETTDRIS71 Diagnose and rectify faults in electrical energy
supply transmission systems (60)
IS71
Transmission
Transmission
Lines
G042+IS71
Page 285 to 307 of
www.highlightcomputer.com/Video Lessons.pdf
Transmission Line
G042 Lesson 1-Transmission line
introduction.zip
G042 Lesson 2-DC Line+Line reflection.zip
G042 Lesson 3-Power line calculation.zip
G042 Lesson 4-Line model+Economic aspect.zip
G042 Lesson 5-Time value of money+Line reflection.zip
G042 Lesson 6-Line matching+Wave guide.zip
G042 Lesson 8-Microstrip line.zip
G042 Lesson 9-Per unit value of line.zip
G042 Lesson 10-Line constants.zip
G042 Lesson 11-Smith chart.zip
G042 Lesson 12-Four terminals network.zip
The links contain the following lessons
G042 Lesson 1-Transmission line introduction
G042 Lesson 2-DC Line+Line reflection
G042 Lesson 3-Power line calculation
G042 Lesson 4-Line model+Economic aspect
G042 Lesson 5-Time value of money+Line reflection
G042 Lesson 6-Line matching+Wave guide
G042 Lesson 7-Wave guide
G042 Lesson 8-Microstrip line
G042 Lesson 9-Per unit value of line
G042 Lesson 10-Line constants
G042 Lesson 11-Smith chart
G042 Lesson 12-Four terminals network
G042 Lesson 13-Exercises
Transmission
Line G042
www.highlightcomputer.com/G042
Mod.zip
UETDRTS026 Undertake power systems project management of
substation augmentation and maintenance (180)
(G169+170+E071)
G169+170 |
Engineering Project Management
011+E117+E071+G169+G170
Projectplanning+management+Risk+OHS. G069+G070+E071+E011+E017.zip
www.highlightcomputer.com/E01124G069G070Mod.zip
Project+Risk-E011+E017+G070+G069
Project
Specification+ Variation
Risk
Management
Project Risk
Assessment and Management
http://www.mongroupsydney1.com/Electrical_Risk_Assessment.pdf
Project Management +Specification Delivery &
Assessment Plan
http://www.mongroupsydney1.com/ProjectManagementSpecificationDeliveryandAssessmentPlan.doc
Project
Management
G169+170 |
E071+G069+G070 + G169+G170
Page 102 to 127 of
www.highlightcomputer.com/Video Lessons.pdf
Project
Specifications+ Project Planning
The links contain the following lessons
E071+G069+G070 Lesson 1 Project management planning
E071+G069+G070 Lesson 2 NSW service rule+Marketing
E071+G069+G070 Lesson 3+4 Contract planning + HV conductor
E071+G069+G070 Lesson 5 Project modelling
E071+G069+G070 Lesson 6 Job planning
E071+G069+G070 Lesson 7 Line infrastructure + Material planning
E071+G069+G070 Lesson 8 Problem solving and decision making
E071+G069+G070 Lesson 9 Control of project+Maintenance specialist
work
E071+G069+G070 Lesson 10 Contract bid work
E071+G069+G070 Lesson 11 Project structure
E071+G069+G070 Lesson 12 Analysing plan+ Insurance
E071+G069+G070 Lesson 13 Modelling project
E071+G069+G070 Lesson 14 Project costing+Contracting paper
work
E071+G069+G070 Lesson 15 Change control
E071+G069+G070 Lesson 16 Management leadership+Job accounting
E071+G069+G070 Lesson 17 Management thinking+Contract management
planning
UETDRTS023 Repair, test and calibrate protection relays and meters
Metering Pathway Unit Group
UETDRTS005 Commission power systems metering schemes
UETDRTS010 Develop power systems secondary isolation instructional documents
UETDRTS014 Maintain and test and metering schemes
Primary Plant Pathway Unit Group
UETDRTS007 Conduct evaluation of power systems primary plant
https://www.pdfdrive.com/reliability-evaluation-of-power-systems-d33462432.html
http://www.iqytechnicalcollege.com/Reliability Evaluation of Power Systems ( PDFDrive ).pdf
UETDRTS010 Develop power systems secondary isolation instructional documents
Protection Systems Pathway Unit Group
UETDRTS010 Develop power systems secondary isolation instructional documents
https://www.pdfdrive.com/practical-power-systems-protection-d34359587.html
http://www.iqytechnicalcollege.com/Practical Power Systems Protection ( PDFDrive ).pdf
https://web.horizonpower.com.au/media/2640/switching-process-and-rulesdoc.pdf
http://www.iqytechnicalcollege.com/switching-process-and-rulesdoc
(1).pdf
UETDRTS015 Maintain complex network protection and control systems
https://www.nature.com/articles/srep24456
www.iqytechnicalcollege.com/srep02764.pdf
http://rpa.energy.mn/wp-content/uploads/2016/07/network-protection-and-automation-guide-book.pdf
www.iqytechnicalcollege.com/network-protection-and-automation-guide-book.pdf
UETDRTS017 Maintain interdependent network protection and control systems
https://ietresearch.onlinelibrary.wiley.com/doi/full/10.1049/gtd2.12177
www.iqytechnicalcollege.com/S017.pdf
https://www.pdfdrive.com/protection-of-electrical-networks-d33483131.html
http://www.iqytechnicalcollege.com/Protection
of Electrical Networks ( PDFDrive ).pdf
https://www.pdfdrive.com/electric-power-system-planning-d39893329.html
www.iqytechnicalcollege.com/Electric-Power-System-Planning-Issues-and-Algorithms-and-Solutions.pdf
ELEMENTS |
PERFORMANCE CRITERIA |
||
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to
demonstrate achievement of the element. |
||
1 |
Plan for the project management of substation augmentation and maintenance |
1.1 |
Work health and safety (WHS)/occupational health and
safety (OHS) practices/procedures and environmental and sustainable energy
procedures, which may influence the undertaking of project management of
substation augmentation and maintenance, are reviewed and determined |
|
|
1.2 |
Purpose of the undertaking of project management of
substation augmentation and maintenance is established after data is analysed
and expected outcomes of the work are confirmed with appropriate personnel |
|
|
1.3 |
Organisational established procedures on policies and
specifications for the undertaking of project management of substation
augmentation and maintenance are obtained or established with appropriate
personnel |
|
|
1.4 |
Testing procedures are discussed with/directed to
appropriate personnel in order to ascertain the project brief |
|
|
1.5 |
Testing parameters are established from organisational established procedures and policies and specifications https://www.pdfdrive.com/manual-of-test-procedures-for-materials-d19693651.html http://www.iqytechnicalcollege.com/Manual of Test Procedures for Materials ( PDFDrive ).pdf |
|
|
1.6 |
Equipment/tools and personal protective equipment (PPE)
are selected based on specified performance criteria and established
procedures |
|
|
1.7 |
Work roles and tasks are allocated according to
requirements and individual competencies |
|
|
1.8 |
Work is prioritised and sequenced for the most
efficient/effective outcome, completed within an acceptable timeframe, to a
quality standard and in accordance with established procedures |
|
|
1.9 |
Liaison and communication issues with others/authorised
personnel, authorities, clients and landowners are resolved and activities
coordinated to carry out work |
|
|
1.10 |
Risk control measures are identified, prioritised and
evaluated against the work schedule |
|
|
1.11 |
Relevant work permits are secured to coordinate the
performance of work according to requirements and/or established procedures |
2 |
Carry out project management of substation augmentation and maintenance |
2.1 |
Circuit/systems modelling is used to evaluate
alternative proposals in accordance with established procedures |
|
|
2.2 |
WHS/OHS and sustainable energy principles, functionality
and practices to reduce the incidents of accidents and minimise waste are
incorporated into the project in accordance with requirements and/or
established procedures |
|
|
2.3 |
Undertaking of project management of substation
augmentation and maintenance decisions are made on the basis of safety and
effective outcomes according to requirements and/or established procedures |
|
|
2.4 |
Mathematical/engineering models of the undertaking of
project management of substation augmentation and maintenance are used to
analyse the effectiveness of the finished project in accordance with
requirements and established procedures |
|
|
2.5 |
Technical advice is given regarding potential hazards,
safety risks and control measures so that monitoring and preventative action
can be undertaken and/or appropriate authorities consulted, where necessary,
in accordance with requirements and established procedures |
|
|
2.6 |
Essential knowledge and associated skills are applied to
analyse specific data and compare it with compliance specifications to ensure
completion of the project within an agreed timeframe according to requirements |
|
|
2.7 |
Testing of substation augmentation and maintenance is
undertaken according to requirements and established procedures |
|
|
2.8 |
Work teams/groups are arranged/coordinated/evaluated to
ensure planned goals are met according to established procedures |
|
|
2.9 |
Solutions to non-routine problems are identified and
actioned, using acquired essential knowledge and associated skills, according
to requirements |
|
|
2.10 |
Quality of work is monitored against personal
performance agreement and/or established organisational and professional
standards |
|
|
2.11 |
Strategic plans are developed incorporating organisation
initiatives in accordance with established procedures |
3 |
Complete the project management of substation augmentation and maintenance |
3.1 |
Final inspections of substation augmentation and
maintenance are undertaken to ensure they comply with all requirements and
include all specifications and documentations needed to complete the project |
|
|
3.2 |
Appropriate personnel are notified of completion and
reports and/or completion documents are finalised/commissioned |
|
|
3.3 |
Reports and/or completion documents are submitted to
relevant personnel/organisations for approval and, where applicable,
statutory or regulatory approval |
|
|
3.4 |
Approved copies of the project management of substation augmentation and maintenance documents are issued and records are updated in accordance with established procedures |
UETDRTS015 Maintain complex network protection and control
systems (180)
IS68+74+I006
IS68+74 |
Power
System Protection |
IS68+74
www.highlightcomputer.com/G015-AE
Mod.zip
http://www.filefactory.com/file/c0b7ff7/n/AE.zip
G015(AE)Lesson 1-Power system protection
scheme.zip
G015(AE)Lesson 2-Differential relay.zip
G015(AE)Lesson_3-Over_current_&_earth_fault_protection.zip
G015(AE)Lesson 4-Three phase differential
relay.zip
G015(AE)Lesson 5-Current time grading.zip
G015AE Lesson 6
G015(AE)Lesson 8-Distance relay.zip
G015(AE)Lesson 9-Telecom in power
protection.zip
UETDRTS010 Develop power systems secondary isolation instructional documents
https://www.pdfdrive.com/practical-power-systems-protection-d34359587.html
http://www.iqytechnicalcollege.com/Practical Power Systems Protection ( PDFDrive ).pdf
https://web.horizonpower.com.au/media/2640/switching-process-and-rulesdoc.pdf
http://www.iqytechnicalcollege.com/switching-process-and-rulesdoc (1).pdf
UETDRTS017 Maintain interdependent network protection and control systems
https://ietresearch.onlinelibrary.wiley.com/doi/full/10.1049/gtd2.12177
https://www.pdfdrive.com/protection-of-electrical-networks-d33483131.html
www.iqytechnicalcollege.com/
https://www.pdfdrive.com/electric-power-system-planning-d39893329.html
http://www.iqytechnicalcollege.com/Protection of Electrical Networks ( PDFDrive ).pdf
ELEMENTS |
PERFORMANCE CRITERIA |
||
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to
demonstrate achievement of the element. |
||
1 |
Plan for the maintenance of network protection and control systems (complex) |
1.1 |
Work health and safety (WHS)/occupational health and
safety (OHS) practices/procedures and environmental and sustainable energy
procedures, which may influence the maintenance of network protection and
control systems (complex), are reviewed and determined |
|
|
1.2 |
Purpose of the maintenance of network protection and
control systems (complex) is established after data is analysed and expected
outcomes of the work are confirmed with appropriate personnel |
|
|
1.3 |
Organisational established procedures on policies and
specifications for the maintenance of network protection and control systems
(complex) are obtained or established with appropriate personnel |
|
|
1.4 |
Testing procedures are discussed with and/or directed to
appropriate personnel in order to ascertain the project brief |
|
|
1.5 |
Testing parameters are ascertained from organisational
established procedures, policies and specifications |
|
|
1.6 |
Equipment/tools and personal protective equipment (PPE)
are selected based on specified performance criteria and established
procedures |
|
|
1.7 |
Work roles and tasks are allocated according to
requirements and individual competencies |
|
|
1.8 |
Work is prioritised and sequenced for the most
efficient/effective outcome, completed within an acceptable timeframe, to a
quality standard and in accordance with established procedures |
|
|
1.9 |
Liaison and communication issues with others/authorised
personnel, authorities, clients and landowners are resolved and activities
coordinated to carry out work |
|
|
1.10 |
Risk control measures are identified, prioritised and
evaluated against the work schedule |
|
|
1.11 |
Relevant work permits are secured to coordinate the
performance of work according to requirements and/or established procedures |
2 |
Carry out the maintenance of network protection and control systems (complex) |
2.1 |
Circuit/systems modelling is used to evaluate
alternative proposals in accordance with established procedures |
|
|
2.2 |
WHS/OHS and sustainable energy principles, functionality
and practices to reduce the incidents of accidents and minimise waste are
incorporated into the project in accordance with requirements and/or
established procedures |
|
|
2.3 |
Maintenance of network protection and control systems
(complex) decisions are made on the basis of safety and effective outcomes
according to requirements and/or established procedures |
|
|
2.4 |
Mathematical and/or engineering models of the scheme are
used to analyse the effectiveness of the finished project in accordance with
requirements and established procedures |
|
|
2.5 |
Technical advice is given regarding potential hazards,
safety risks and control measures so that monitoring and preventative action
can be undertaken and/or appropriate authorities consulted, where necessary,
in accordance with requirements and established procedures |
|
|
2.6 |
Essential knowledge and associated skills are applied to
analyse specific data and compare it with compliance specifications to ensure
completion of the project within an agreed timeframe according to
requirements |
|
|
2.7 |
Testing of network protection and control systems
(complex) is undertaken according to requirements and established procedures |
|
|
2.8 |
Work teams/groups are arranged/coordinated/evaluated to
ensure planned goals are met according to established procedures |
|
|
2.9 |
Solutions to non-routine problems are identified and
actioned, using acquired essential knowledge and associated skills, according
to requirements |
|
|
2.10 |
Quality of work is monitored against personal
performance agreement and/or established organisational and professional
standards |
|
|
2.11 |
Strategic plans are developed incorporating organisation
initiatives in accordance with established procedures |
3 |
Complete the maintenance of network protection and control systems (complex) |
3.1 |
Final inspections of the network protection and control
systems (complex) are undertaken to ensure they comply with all requirements
and include all specifications and documentation needed to complete the
project |
|
|
3.2 |
Appropriate personnel are notified of completion and
reports and/or completion documents are finalised/commissioned |
|
|
3.3 |
Reports and/or completion documents are submitted to
relevant personnel/organisations for approval and, where applicable,
statutory or regulatory approval |
|
|
3.4 |
Approved copies of the maintenance of network protection and control systems (complex) documents are issued and records are updated in accordance with established procedures |
UETDRTS006 Conduct evaluation of power system substation
faults (140)
7762AB
G149 |
E125+G149
www.highlightcomputer.com/Circuit
G048E025G049-Mod.zip
UETDRSO009 Manage power systems transmission networks (180)
IS69
www.highlightcomputer.com/G015-AG
Mod.zip
7761M
https://www.pdfdrive.com/protection-substation-automation-power-quality-and-siemens-e15229427.html
https://www.pdfdrive.com/power-system-analysis-power-system-analysis-2nd-ed-d176072996.html
http://www.iqytechnicalcollege.com/Power
System Analysis Power System Analysis.pdf
https://www.pdfdrive.com/handbook-of-electric-power-calculations-podeliseru-e6136753.html
ELEMENTS |
PERFORMANCE CRITERIA |
||
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to
demonstrate achievement of the element. |
||
1 |
Plan for the evaluation of power system events |
1.1 |
Work health and safety (WHS)/occupational health and
safety (OHS) practices/procedures and environmental and sustainable energy
procedures, which may influence the evaluation of power system failures, are
reviewed and determined |
|
|
1.2 |
Purpose of the evaluation of power system events are
established after data is analysed and expected outcomes of the work are
confirmed with appropriate personnel |
|
|
1.3 |
Organisational established procedures on policies and specifications
for the evaluation of power system failures are obtained or established with
appropriate personnel |
|
|
1.4 |
Testing procedures are discussed with/directed to
appropriate personnel in order to ascertain the project brief |
|
|
1.5 |
Testing parameters are established from organisational
established procedures on policies and specifications |
|
|
1.6 |
Equipment/tools and personal protective equipment (PPE)
are selected based on specified performance criteria and established
procedures |
|
|
1.7 |
Work roles and tasks are allocated according to
requirements and individual competencies |
|
|
1.8 |
Work is prioritised and sequenced for the most
efficient/effective outcome, completed within an acceptable timeframe, to a
quality standard and in accordance with established procedures |
|
|
1.9 |
Liaison and communication issues with others/authorised
personnel, authorities, clients and landowners are resolved and activities
coordinated to carry out work |
|
|
1.10 |
Risk control measures are identified, prioritised and
evaluated against the work schedule |
|
|
1.11 |
Relevant work permits are secured to coordinate the
performance of work according to requirements and/or established procedures |
2 |
Carry out the evaluation of power system events |
2.1 |
Circuit/systems modelling is used to evaluate
alternative proposals in accordance with established procedures |
|
|
2.2 |
WHS/OHS and sustainable energy principles, functionality
and practices to reduce the incidents of accidents and minimise waste are incorporated
into the project in accordance with requirements and/or established
procedures |
|
|
2.3 |
Following evaluation of power system events, decisions
are made on the basis of safety and effective outcomes according to requirements
and/or established procedures |
|
|
2.4 |
Mathematical and /or engineering models of the
evaluation of power system events are used to analyse the effectiveness of
the finished project in accordance with requirements and established
procedures |
|
|
2.5 |
Technical advice is given regarding potential hazards,
safety risks and control measures so that monitoring and preventative action
can be undertaken and/or appropriate authorities consulted, where necessary,
in accordance with requirements and established procedures |
|
|
2.6 |
Essential knowledge and associated skills are applied to
analyse specific data and compare it with compliance specifications to ensure
completion of the project within an agreed timeframe according to
requirements |
|
|
2.7 |
Testing of power system is undertaken according to
requirements and established procedures |
|
|
2.8 |
Work teams/groups are arranged/coordinated/evaluated to
ensure planned goals are met according to established procedures |
|
|
2.9 |
Solutions to non-routine problems are identified and
actioned, using acquired essential knowledge and associated skills, according
to requirements |
|
|
2.10 |
Quality of work is monitored against personal
performance agreement and/or established organisational and professional
standards |
|
|
2.11 |
Strategic plans are developed incorporating organisation
initiatives in accordance with established procedures |
3 |
Complete the evaluation of power system events |
3.1 |
Final evaluation of all relevant data pertaining to the
power system event is undertaken to ensure the recommendations comply with
all requirements and include all specifications and documentations needed to
complete the project |
|
|
3.2 |
Appropriate personnel are notified of completion and
reports and/or completion documents are finalised/commissioned |
|
|
3.3 |
Reports and/or completion documents are submitted to
relevant personnel/organisations for approval and, where applicable,
statutory or regulatory approval |
|
|
3.4 |
Approved copies of the evaluation of power system event documents are issued and records are updated in accordance with established procedures |
UETDRSO007 Manage high voltage distribution and
sub-transmission network demand (180)
(7762AA)
IS67+69
Power
System 1-G015+G046+A010
www.highlightcomputer.com/G015-AA
Mod.zip
Electrical
Distribution Lessons
IS67+69
Power
System 1-G015+G046+A010
www.highlightcomputer.com/G015-AA
Mod.zip
G015/
IS67+68+ IS74
Page 196 to 231 of
www.highlightcomputer.com/Video Lessons.pdf
Power System (1)
G015(AA)Lesson 1-Distribution system.zip
G015(AA)Lesson 2-Demand factor.zip
G015(AA)Lesson 4-OH Line mechanical
design.zip
G015(AA)Lesson 6-Voltage control.zip
Assessment Requirements for UETDRSO007 Manage high voltage distribution and sub-transmission network demand
Evidence required to demonstrate competence in this unit
must be relevant to and satisfy all of the requirements of the elements and
performance criteria on at least two separate occasions and include: |
· applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including the use of risk control measures · applying sustainable energy principles and practices · demonstrating at least three (3) system manipulations that encompass the following: · high voltage (HV) sub-transmission distribution network · transmission network manipulation to control loading on equipment · transformers with HV windings · HV busbars · HV isolators · HV switchgear (applicable to enterprise equipment) https://www.pdfdrive.com/extra-high-voltage-ac-transmission-engineering-e158721900.html http://www.iqytechnicalcollege.com/Extra High Voltage A.C. Transmission Engineering ( PDFDrive ).pdf · managing multiple switching instructions · https://web.horizonpower.com.au/media/2639/switching-operators-manual-distribution.pdf www.iqytechnicalcollege.com/ ·
· coordinating the status of access permits/authorities on HV network equipment · https://www.transgrid.com.au/media/dpdkojzo/access-for-work-on-high-voltage-substation-apparatus.pdf www.iqytechnicalcollege.com/switching-operators-manual-distribution.pdf ·
· ensuring network plant operates within design and regulatory requirements on a real time basis · https://www.safeworkaustralia.gov.au/system/files/documents/1703/guide-safe-design-plant.pdf www.iqytechnicalcollege.com/guide-safe-design-plant.pdf ·
· calculating line loading ·
·
· preparing and authorising HV distribution switching programs · https://www.sa.gov.au/__data/assets/pdf_file/0011/398504/20190313-Switching-Manual-TR-V5_1.pdf www.iqytechnicalcollege.com/20190313-Switching-Manual-TR-V5_1.pdf ·
·
· demonstrating application of supervisory control and data acquisition (SCADA) or equivalent · analysing, diagnosing and reporting system failures · https://www.pdfdrive.com/plc-scada-based-substation-automation-d39204616.html http://www.iqytechnicalcollege.com/plc
& scada based substation automation ( PDFDrive ).pdf ·
·
· calculating and analysing paralleling conditions on the interconnected HV system as applicable to the entity www.iqytechnicalcollege.com/Distribution-Network-Operation-Manual.pdf ·
·
· preparing, writing and checking switching sheets to undertake all of the following: · managing load · managing voltage · minimising loss · maximising system reliability · allowing safe network access for maintenance activities · allowing safe network access for construction activities · validating fault reports arising from system disturbances · dealing with unplanned events on at least one (1) occasion, https://web.horizonpower.com.au/media/2639/switching-operators-manual-distribution.pdf www.iqytechnicalcollege.com/switching-operators-manual-distribution.pdf Study
Package (1)-OHS Study
Package (2)-Power System Planning Study Package
(3)-Testing Study
Package (4) Power Transformer 6-ESI Study Package 7 (4,8,11,13) 4-ESI Study Package 4 (7) + 11 (21) Study
Package (5) Machine Installation Study
Package (6+ 10) HV Equipments Study Package
(7) Drawing 4-ESI Study Package 4 (7) + 11 (21) Study
Package (8) Insulation 6-ESI Study Package 7 (4,8,11,13) Study Package
(9) Protection Study Package
(10) HV Equipments Study
Package (12) Harmonics Study
Package (13) Voltage Regulation 6-ESI Study Package 7 (4,8,11,13) Study
Package (15) Electrical Estimating Study Package
(16+17)-OHS Study
Package (19) Generator 15-ESI Study Package 19 (3132) Study
Package (20) Transmission System Study
Package (21+34)-Electrical Distribution 4-ESI Study Package 4 (7) + 11 (21) Study Package
(22) Generator Study
Package (23) Machine Rating Study Package
(24) Signal Communication Study
Package (25+27+31+32) Installation & Testing Study
Package (24) Modern Power System Study
Package (25+27+31+32) Installation & Testing 15-ESI Study Package 19 (3132) Study
Package (27) Relay Study
Package (28) Power Accessories Study
Package (34) Power Equipments Commissioning Study
Package (34) Equipments Commissioning |
Evidence required to demonstrate competence in this unit
must be relevant to and satisfy all of the requirements of the elements and
performance criteria and include knowledge of: |
· enterprise-specific procedures and work practices relating to managing network demand encompassing: · Commonwealth/state/territory and local government legislation, supply authority regulations, standards, codes and/or enterprise requirements applicable to the procedures and work practices relating to managing network demand · requirements for the use of demand management manuals, system diagrams/plans and drawings · https://www.evoenergy.com.au/emerging-technology/demand-management www.iqytechnicalcollege.com/Demand management - Evoenergy.pdf · identifying and interpreting enterprise demand management procedures · https://www.netsuite.com/portal/resource/articles/inventory-management/demand-management.shtml · techniques in applying enterprise demand management procedures · effective management and communication encompassing: · https://www.erp-information.com/demand-management.html www.iqytechnicalcollege.com/What is Demand Management.pdf · Commonwealth/state/territory and local government legislation, standards, codes, supply authority regulations and/or enterprise requirements applicable to assisting in effective management and communication · enterprise operational principles - workplace WHS/OHS enterprise plan, environmental enterprise policies and procedures, industrial relations policies and procedures, and anti-discrimination policies and procedures · relationship between the management and employees - methods used to collate and distribute/disseminate information, responsibilities of each member of the work team, staff development activities and legislation requirements with regard to WHS/OHS training, methods of addressing barriers such as literacy and cultural differences, and provisions relating to WHS/OHS issue resolution · techniques associated with organisational policies and procedures related to human resources - relevant awards and certified agreements, legislation impacting on people management, range of support services and expertise available · techniques in managing relationships - identifying problems; methods of conflict resolution; methods of consultation, communication, negotiation and mentoring; and strategies for positive feedback · techniques in leadership in achieving enterprise strategic and operational plans · https://www.pdfdrive.com/leadership-management-e33599985.html http://www.iqytechnicalcollege.com/2Dr
Rebecca Jones Nursing Leadership and Manage.pdf · techniques in managing relationships under stress - stress management · methodology used in writing enterprise-specific management reports encompassing: · https://www.pdfdrive.com/stress-management-e42754115.html www.iqytechnicalcollege.com/003-3-Stress_Management_Extra_Webpages.pdf · Commonwealth/state/territory and local government legislation, supply authority regulations, standards, codes and/or enterprise requirements applicable to the writing enterprise-specific management reports · https://www.pdfdrive.com/testing-commissioning-procedure-for-electrical-installation-d8566974.html · techniques in researching, collating and analysing information for the report - recording, filing, retrieving systems, and storing and retrieving data from computer systems · https://www.pdfdrive.com/research-methodology-tools-and-techniques-e17306960.html www.iqytechnicalcollege.com/9.pdf · relationship of management reports to enterprise policies and procedures - enterprise structure and resources, workplace WHS/OHS and risk management enterprise data, financial and operational data, environmental enterprise policies and procedures, industrial relations policies and procedures, and anti-discrimination policies and procedures · techniques in writing enterprise-specific management reports - methods used to disseminate information and facilitate enterprise requirements, document proformas, and compliance and legislative requirements to produce effective reports in the appropriate format. |
http://ghill.customer.netspace.net.au/reporting/
http://www.iqytechnicalcollege.com/Enterprise
Reporting Guide.pdf
UETDRDS001 Design customer power system substations (140)
G037+38_39)
G037+G038+G039
Part 1/2/3+IS69
Page 232 to 270
www.highlightcomputer.com/Video Lessons.pdf
Power System (2)
G037+G038+G039 Lesson 1-Power Flow.zip
G037+G038+G039 Lesson 2-Site Earthing.zip
G037+G038+G039 Lesson 3-Power System Control
Equipments.zip
G037+G038+G039 Lesson 4-Auxiliary
System+Harmonic.zip
G037+G038+G039 Lesson 5-Harmonic.zip
G037+G038+G039 Lesson 6-Harmonic
Calculation.zip
G037+G038+G039 Lesson 7-Synchronous
Generator Loading.zip
G037+G038+G039 Lesson 8-Turbine Control+Power Line Earthing.zip
G037+G038+G039 Lesson 9-Insulator.zip
G037+G038+G039 Lesson 10-Reliability of
Power System.zip
G037+G038+G039 Lesson 11-Harmonic
Reduction.zip
G037+G038+G039 Lesson 12-Grounding + Power
Quality.zip
G037+G038+G039 Lesson 13-Power Quality.zip
G037+G038+G039 Lesson 14-Harmonic Model.zip
G037+G038+G039 Lesson 15-Harmonic Losses in
Transformer.zip
G037+G038+G039 Lesson 16-Reliability
Improvement.zip
G037+G038+G039 Lesson 17-Preparation for
emergency.zip
G037+G038+G039 Lesson 18-Harmonic
problems.zip
G037+G038+G039 Lesson 19-Synchronous machine
problems.zip
G037+G038+G039 Lesson 20-Power Generation +
Generator Control.zip
G037+G038+G039 Lesson 21-Turbine Control+
Digital Excitation.zip
G037+G038+G039 Lesson 22-Power System
Protection.zip
G037+G038+G039 Lesson 23-Switch Gear.zip
The links contain the following lessons
G037+G038+G039 Lesson 1-Power Flow
G037+G038+G039 Lesson 2-Site Earthing
G037+G038+G039 Lesson 3-Power System Control Equipments
G037+G038+G039 Lesson 4-Auxiliary System+ Harmonic
G037+G038+G039 Lesson 5-Harmonic
G037+G038+G039 Lesson 6-Harmonic Calculation
G037+G038+G039 Lesson 7-Synchronous Generator Loading
G037+G038+G039 Lesson 8-Turbine Control+ Power Line Earthing
G037+G038+G039 Lesson 9-Insulator
G037+G038+G039 Lesson 10-Reliability of Power System
G037+G038+G039 Lesson 11-Harmonic Reduction
G037+G038+G039 Lesson 12-Grounding + Power Quality
G037+G038+G039 Lesson 13-Power Quality
G037+G038+G039 Lesson 14-Harmonic Model
G037+G038+G039 Lesson 15-Harmonic Losses in Transformer
G037+G038+G039 Lesson 16-Reliability Improvement
G037+G038+G039 Lesson 17-Preparation for emergency
G037+G038+G039 Lesson 18-Harmonic problems
G037+G038+G039 Lesson 19-Synchronous machine problems
G037+G038+G039 Lesson 20-Power Generation + Generator Control
G037+G038+G039 Lesson 21-Turbine Control+ Digital Excitation
G037+G038+G039 Lesson 22-Power System Protection
G037+G038+G039 Lesson 23-Switch Gear
www.highlightcomputer.com/A010Mod.zip
Power system 2-G037+G038+G039.zip
UETDRDS013 Organise and implement ESI line and easement surveys
https://linedesigntechnology.com/overhead-line-survey/
http://www.iqytechnicalcollege.com/Overhead
Line Survey › Line Design Technology.pdf
https://www.ajol.info/index.php/mjst/article/view/185781/175083
http://www.iqytechnicalcollege.com/185781-Article Text-472343-1-10-20190418 (1).pdf
https://www.mdpi.com/2072-4292/13/8/1571/pdf
http://www.iqytechnicalcollege.com/remotesensing-13-01571-v2
(2).pdf
www.iqyrechnicalcollege.com/Matikainenetal-Remotesensingmethodsforpowerlinecorridorsurveys.pdf
UETDRDS014 Prepare and manage detailed construction plans for electrical power system infrastructure
https://www.pdfdrive.com/planning-of-electric-power-distribution-e33404975.html
http://www.iqytechnicalcollege.com/Planning of Electric Power Distribution ( PDFDrive ).pdf
https://www.pdfdrive.com/electric-power-system-planning-d39893329.html
http://www.iqytechnicalcollege.com/Planning of Electric Power Distribution ( PDFDrive ).pdf
ELEMENTS |
PERFORMANCE CRITERIA |
||
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to
demonstrate achievement of the element. |
||
1 |
Plan for and coordinate the design of customer substations |
1.1 |
Work health and safety (WHS)/occupational health and
safety (OHS) practices/procedures and environmental and sustainable energy
procedures, which may influence the design of customer substations, are
reviewed and determined |
|
|
1.2 |
Purpose of the design is established and expected outcomes of the work are confirmed with appropriate personnel What is the purpose of the substation? The purpose of a substation is to
'step down' high voltage electricity from the transmission system to lower
voltage electricity so it can be easily supplied to homes and businesses in
the area through lower voltage distribution lines. |
|
|
1.3 |
Organisational established procedures on policies and specifications for the design are obtained or established with appropriate personnel https://www.ausgrid.com.au/-/media/Documents/Technical-Documentation/NS/NS185.pdf www.iqytechnicalcollege.com/NS185.pdf |
|
|
1.4 |
Equipment/tools and personal protective equipment (PPE) are selected and coordinated based on specified requirements and established procedures https://www.substation-safety.com/latest-news/electric-substation-personal-protective-equipment-ppe/ http://www.iqytechnicalcollege.com/Electric Substation Personal Protective Equipment (PPE).pdf |
|
|
1.5 |
Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures https://www.youtube.com/watch?v=4jBXUqRT62E http://www.iqytechnicalcollege.com/Substation-Civil-Design-and-Construction-Standard-pdf.pdf |
|
|
1.6 |
Risk control measures are identified, prioritised and evaluated against the work schedule https://www.transgrid.com.au/media/tipplrge/work-in-substations-general.pdf www.iqytechnicalcollege.com/work-in-substations-general.pdf |
|
|
1.7 |
Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures https://www.transgrid.com.au/media/dpdkojzo/access-for-work-on-high-voltage-substation-apparatus.pdf http://www.iqytechnicalcollege.com/access-for-work-on-high-voltage-substation-apparatus.pdf |
|
|
1.8 |
Resources, including personnel, equipment, tools and PPE, required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order https://www.youtube.com/watch?v=7Q-aVBv7PWM&vl=en https://electrical-engineering-portal.com/substation-basics www.iqytechnicalcollege.com/Substation Basic.zip |
|
|
1.9 |
Liaison and communication issues with other/authorised personnel, authorities, clients and landowners are resolved and activities coordinated to carry out work https://www.safetyandquality.gov.au/standards/nsqhs-standards/communicating-safety-standard www.iqytechnicalcollege.com/Communicating for Safety Standard.pdf |
|
|
1.10 |
Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures https://www.latham-australia.com/blog/safety-measures-construction-site |
2 |
Carry out and coordinate the design of customer substations |
2.1 |
Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures |
|
|
2.2 |
WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidence of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4963541/ |
|
|
2.3 |
Substation design decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures https://www.electricalandcontrol.com/key-factors-to-consider-in-substation-design/ http://www.iqytechnicalcollege.com/Key Factors to Consider In Substation Design.pdf |
|
|
2.4 |
Mathematical models of the customer substation are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures https://www.pdfdrive.com/mathematical-modeling-and-simulation-e34334406.html http://www.iqytechnicalcollege.com/Mathematical
Modeling and Simulation ( PDFDrive ).pdf |
|
|
2.5 |
Technical advice is given to potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures https://www.energycouncil.com.au/media/15808/eafhm_guideline_30_25-03-2019_web.pdf http://www.iqytechnicalcollege.com/eafhm_guideline_30_25-03-2019_web.pdf https://www.substation-safety.com/latest-news/safety-practices-substations/ http://www.iqytechnicalcollege.com/Safety Practices in Substations.pdf |
|
|
2.6 |
Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements https://core.ac.uk/download/pdf/4267982.pdf www.iqytechnicalcollege.com/4267982.pdf |
|
|
2.7 |
Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements http://www.iqytechnicalcollege.com/Substation Asset Methodology Framework.pdf |
|
|
2.8 |
Quality of work is monitored against personal performance agreement and/or established organisational and professional standards www.iqytechnicalcollege.com/NI000401R122-Subs-Construction-Manual.pdf www.iqytechnicalcollege.com/ElectricPowerQuality.zip |
3 |
Complete and coordinate the design of customer substations |
3.1 |
Final inspections of the design are undertaken to ensure it complies with all requirements and includes all specifications and documentations needed to complete the design brief https://www.transgrid.com.au/media/zgogqoqg/substation-primary-design-standard.pdf www.iqytechnicalcollege.com/substation-primary-design-standard.pdf http://www.iqytechnicalcollege.com/substation-primary-design-standard.pdf |
|
|
3.2 |
Appropriate personnel are notified of completion and reports and/or completion documents are finalised www.iqytechnicalcollege.com/distribution-substation-manual-substation-arrangements-20191220.pdf |
|
|
3.3 |
Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval https://public.wsu.edu/~campbelld/engl402/reportlecture.htm http://www.iqytechnicalcollege.com/Types
of Reports_ Completion Reports and Feasibility Studies.pdf https://opentextbc.ca/projectmanagement/chapter/chapter-18-project-completion-project-management/ http://www.iqytechnicalcollege.com/18. Project Completion – Project Management – 2nd Edition.pdf |
|
|
3.4 |
Approved copies of design documents are issued and records are updated in accordance with established procedures https://www.lawinsider.com/clause/design-development-documents-approval |
Practical
https://mega.nz/folder/urBhXKga#bGXR7CRagW1vj0KwxNKndw
Other References
Advanced Diploma in
Electricity Supply Industry (ESI)
Study Package
(1)-OHS
Study Package
(2)-Power System Planning
Study Package
(3)-Testing
Study Package
(4) Power Transformer
6-ESI Study Package 7 (4,8,11,13)
4-ESI Study Package 4 (7) + 11 (21)
Study Package
(5) Machine Installation
Study Package
(6+ 10) HV Equipments
Study Package
(7) Drawing
4-ESI Study Package 4 (7) + 11 (21)
Study Package
(8) Insulation
6-ESI Study Package 7 (4,8,11,13)
Study Package
(9) Protection
Study Package
(10) HV Equipments
Study Package
(12) Harmonics
Study Package
(13) Voltage Regulation
6-ESI Study Package 7 (4,8,11,13)
Study Package
(15) Electrical Estimating
Study Package
(16+17)-OHS
Study Package
(19) Generator
15-ESI Study Package 19 (3132)
Study Package
(20) Transmission System
Study Package
(21+34)-Electrical Distribution
4-ESI Study Package 4 (7) + 11 (21)
Study Package
(22) Generator
Study Package
(23) Machine Rating
Study Package
(24) Signal Communication
Study Package
(25+27+31+32) Installation & Testing
Study Package
(24) Modern Power System
Study Package
(25+27+31+32) Installation & Testing
15-ESI Study Package 19 (3132)
Study Package
(27) Relay
Study Package
(28) Power Accessories
Study Package
(34) Power Equipments Commissioning
Study Package
(34) Equipments Commissioning