Metering
Qualification
www.iqytechnicalcollege.com/Metering.htm
TOPIC 1. UEEEL0013/ UEEEL0078/UEEENEEG171A
ELEMENTS |
PERFORMANCE
CRITERIA |
|
Lesson |
||
Elements describe the essential
outcomes. |
Performance criteria describe the
performance needed to demonstrate achievement of the element. |
|
|
||
1 |
Prepare to install whole current meter |
1.1 |
Scope of work activity is confirmed
from the work order / instruction, in consultation with supervisor /
authorised person |
Lesson 1 T1-Reasons for metering and the regulated market +Assessment 1 |
Refer TechGuide-Energy-metering-monitoring-guide Read Page 3 to 5 |
|
|
1.2 |
Appropriate electricity meter and
enclosure are identified and confirmed in accordance with workplace
procedures |
Lesson 1 T1-Reasons for metering and the regulated market +Assessment 1 |
Refer TechGuide-Energy-metering-monitoring-guide Read Appendix C Type of meters Page 46 |
|
|
1.3 |
Customer is advised of proposed work
and scheduling in accordance with job requirements/specifications and
workplace procedures |
Lesson 1 T1-Reasons for metering and the regulated market +Assessment 1 |
Refer TechGuide-Energy-metering-monitoring-guide Read Page 38 People and Responsibility |
|
|
1.4 |
Work Health and Safety (WHS) /
Occupational Health and Safety (OHS) requirements and relevant workplace
procedures including de-energising, isolation and energising are identified
and implemented |
CD0007 |
|
|
|
1.5 |
Hazards are identified, risks assessed,
and risk control measures and Safe Work Method Statements (SWMS) applied |
CD0007 |
|
|
|
1.6 |
Switchboard on which the meter is to be
installed is inspected and evaluated for compliance with safety and
functionality requirements and industry standards |
Lesson 3-Interval metering +Assessment 3 |
Read What is interval metering Read Interval metering and Interval Data Read EL0078-Bi-directional-meters-explained Read EL0078-What is Bidirectional Meter_ - Energy Theory Read Block-diagram-for-the-metering-system Read Smart Meter Circuit Design & Block Diagram » Electronics Notes |
|
|
1.7 |
Approval to rectify safety and/or
functionality defects identified by visual inspection of the switchboard is
sought from relevant person/s in accordance with workplace procedures |
Lesson 3-Interval metering +Assessment 3 |
Read What are the metering parameters Read Type of meters – Ausgrid Read ACE 3000 Type 520 Residential Polyphase Single_Multi-Rate Electronic Meter Read What does import and export mean on electricity meter Read Single phase export import meter |
|
|
1.8 |
Installation and any rectification work
is planned and sequenced appropriately in consultation with relevant person/s
and in accordance legislative framework |
Lesson 4 Meter Installations +Assessment 4 |
Lesson 4-EL0078 1.8 Meter Installations Read Section 3 Installation and Section 4 Wiring |
|
|
1.9 |
Confirmation that safe isolation of the
installation, access to a communication’s connection and implementation of
any relevant safeguards to associated metering services can be completed in
accordance with job requirements is obtained |
Lesson 5-Safe Isolation +Assessment 5 |
Read Lesson 5-EL0078-1.9 Safe Isolation Procedures _ Fluke |
|
|
1.10 |
Resources, materials, tools, equipment
and testing devices are obtained and checked for correct operation and safety
and against job requirements and specifications in accordance with workplace
procedures |
Lesson 2-T2-Metering layouts and requirements +Assessment 2 |
Refer Metering-Installations Read Page 11 (6.2.1, 6.2.2) Refer 2018_07_NSW_Annexure ToServiceAndInstallationRules Of NSW Read Section 2 METERING EQUIPMENT Refer Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Electrical Contractor’s LV CT Metering Check Sheet |
|
|
1.11 |
Personal Protective Equipment (PPE) is
selected, checked and used accordance with workplace procedures |
CD0007 |
|
2 |
Install whole current electricity meter |
2.1 |
Need to test or measure live work is
determined in accordance with WHS/OHS requirements, workplace procedures and
SWMS |
Lesson 11 Safe Isolation +Assessment 11 |
View Isolation procedure Videos for Single Phase and Three Phase |
|
|
2.2 |
Pre installation tests and assessments
are carried out, correct meter to be replaced confirmed and information
documented in accordance with workplace procedures |
Lesson 6-LV Testing +Assessment 6 |
Refer Lesson 6-EL0078 -2.2 Page 25 -low-voltage-testing-manual Read 5.1 Pre-test visual inspection |
|
|
2.3 |
Approval to rectify safety and/or
functionality defects identified by testing and assessment is sought from
relevant person/s in accordance with workplace procedures |
Lesson 12 Working near power lines +Assessment 12 |
Refer Lesson 12-EL0078 (2.3)Working near power lines Read all |
|
|
2.4 |
Work activities outside of the limits
of own authority and/or qualification are identified, and assistance sought
if required in accordance with operating instructions and workplace
procedures |
Lesson 2-T2-Metering layouts and requirements +Assessment 2 |
Refer Metering-Installations Read Page 11 (6.2.1, 6.2.2) Refer 2018_07_NSW_Annexure ToServiceAndInstallationRules Of NSW Read Section 2 METERING EQUIPMENT Refer Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Electrical Contractor’s LV CT Metering Check Sheet |
|
|
2.5 |
Existing meter is isolated by
authorised person and checked and tested to confirm ‘deenergised’ in
accordance with workplace procedures and WHS/OHS requirements |
Lesson 5 Safe Isolation +Assessment 5 |
Read Lesson 5-EL0078-1.9 Safe Isolation Procedures _ Fluke |
|
|
2.6 |
Approved rectification work is carried
out to comply with industry standards and in accordance with workplace
procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.7 |
Meter is installed to comply with
relevant technical industry standards, job specifications and workplace
procedures and requirements |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.8 |
Meter power and communication
connections, and where required communications technology device
installation, are made in accordance with manufacturer and job specifications
and workplace procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.9 |
Meter is configured and functionality
confirmed in accordance with manufacturer specifications and workplace
procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.10 |
Work progress is monitored against the
approved pre-start risk assessment (workplan) and adjustments to the plan
made, as required, in accordance with workplace procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.11 |
Test procedures are performed to
establish and confirm a neutral integrity test point (NITP), integrity of
MEN, phase rotation where applicable, and main earth connections in
accordance with workplace procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.12 |
Ongoing checks of the quality of
installation are undertaken in accordance with workplace procedures |
Lesson 7-Metering Manual Applications +Assessment 7 |
Lesson 7-EL0078-2.6 to 2.13 Queensland-Electricity-Metering-Manual-QEMM Read Section 2+3+4 |
|
|
2.13 |
Installation is carried out efficiently
without unnecessary waste of materials or damage to apparatus circuits, the
surrounding environment or services using sustainable energy principles |
Lesson 2-T2-Metering layouts and requirements +Assessment 2 |
Refer CMIG Meter Installation Requirements Read Page 11 to 21 |
|
|
2.14 |
Unplanned situations are responded to
in accordance with workplace procedures in a manner that minimises risk to
personnel and equipment |
CD0007 |
|
3 |
Complete meter installation activity and report completion of work |
3.1 |
WHS/OHS work completion risk control
measures and workplace procedures are followed |
CD0007 |
|
|
|
3.2 |
Supply is reinstated ‘energised’ to the
installation in accordance with workplace procedures |
Lesson 8-Power restoration +Assessment 8 |
Refer Lesson 8-EL0078-3.2 How Power is Restored – Pioneer Electric Read all |
|
|
3.3 |
Final inspection and tests are made to
ensure the installation conforms to job requirements and workplace procedures |
Lesson 9 Electrical Testing +Assessment 9 |
Refer Lesson 9-EL0078-3.3 Electrical Testing Sequence Read all |
|
|
3.4 |
Worksite and tools are cleaned and made
safe, and waste disposed of, in accordance with workplace procedures |
Lesson 9 Electrical Testing +Assessment 9 |
Refer Lesson 9-EL0078-3.3 Electrical Testing Sequence Read all |
|
|
3.5 |
Where required, hazardous waste is
removed and disposed of in accordance with regulatory requirements and
workplace procedures |
Lesson 9 Electrical Testing +Assessment 9 |
Refer Lesson 9-EL0078-3.3 Electrical Testing Sequence Read all |
|
|
3.6 |
Final visual inspection of installation
and work area is performed to ensure the work site is left clean of any
hazardous materials or substances in accordance with workplace procedures |
Lesson 6 LV Testing +Assessment 6 |
Refer Lesson 6-EL0078 -2.2 Page 25 -low-voltage-testing-manual Read 5.2 Post-test visual inspection |
|
|
3.7 |
‘As-installed’ meter or rectification
work is documented, and appropriate person/s notified in accordance with
workplace procedures |
Lesson 3-T3-Interval metering +Assessment 3 |
Read What are the metering parameters Read Type of meters – Ausgrid Read ACE 3000 Type 520 Residential Polyphase Single_Multi-Rate Electronic Meter Read What does import and export mean on electricity meter Read Single phase export import meter |
|
|
3.8 |
Installation and certification
compliance report/s and other documentation is updated and submitted, as
required, in accordance with workplace procedures |
Lesson 10 Metering Documentations +Assessment 10 |
Refer Lesson 10-EL0078 -3.8 to 3.10-Metering Documentations Read Section 2 B1- SINGLE PHASE ACCUMULATION (FLAT RATE) METERS |
|
|
3.9 |
Work supervisor or authorised person/s
notified of completion of work and the completion of activity is documented
in accordance with the pre-start risk assessment (workplan) |
Lesson 10 Metering Documentations +Assessment 10 |
Refer Lesson 10-EL0078 -3.8 to 3.10-Metering Documentations Read Section 3 B3 – THREE PHASE ACCUMULATION (FLAT RATE) METERS |
|
|
3.10 |
Metering installation work outcomes, configurations and completion of work is communicated to the customer in accordance with workplace procedures |
Lesson 10 Metering Documentations +Assessment 10 |
Refer Lesson 10-EL0078 -3.8 to 3.10-Metering Documentations 6.4.4 Wiring Configuration Page 133 |
TOPIC 2
UETTDRRF11A
- Testing of connections to low voltage electricity Network Lesson
· Lesson 1 Workplace requirements for perform testing
of connections Part 1-Regulatory Aspect and Technical Definitions
Lesson
1 Workplace requirements for perform testing of connections Part 1-Regulatory
Aspect and Technical Definitions
To perform the testing task on electricity supply,
the following safety regulations must be followed.the NSW Work Health and Safety Regulation
(2017), the Electricity Supply Act 1995 and the National
Electricity Network Safety Code (ENA DOC 01-2019).
The tasks to be complied
with the safety regulations are :
You need to be familiar with the following
technical definitions
Active Conductor - Any conductor that is maintained at a difference of potential from the
neutral or earthed conductor.
Competent - Having the skills, knowledge and
attributes a person needs to complete a task.
Connection Point - The definition of Connection Point fulfils the
requirements of defining the Connection Point in the Electricity Supply Act.
Means the junction where the Distribution System is connected (by means of a
Connection Device) to the Customers Installation.
DNSP – Distribution Network Service Provider owns and
maintains the distribution electricity network.
Electrical Installation
- Electrical equipment
installed for the purposes of conveyance, control, measurement or use
of electricity, where electricity is or is to be supplied for consumption. It
includes electrical equipment supplied from a distributor’s system or a private
generating system.
Electricity Network - Low voltage system used to distribute electricity
to electrical installations.
Independent earth - An effective earthed reference point used for
testing purposes, spaced a minimum of two metres away from any conductive object embedded in the
ground connected to the system under test.
Industry Safety Steering
Committee (ISSC) means
a committee established by the Minister for Energy and Environment formed of
representatives of the electricity transmission and distribution industry,
trade unions and other relevant stakeholders to examine and provide
recommendations and documentation for use by the industry to improve safety for
the public and workers.
Integrity - The state of being sound, unimpaired and
fit for purpose.
Isolated - Disconnected from all possible sources of electricity
supply by means that both prevent unintentional energization of the apparatus
and are assessed as a suitable step in the process of making safe for access
purposes.
May - Indicates the existence of an option.
Multiple earthed neutral
(MEN) system - A
system in which the neutral conductor is connected to the general mass of the
earth at multiple locations within the electricity network and electrical
installations.
Neutral conductor - Conductor of a low voltage system which is earthed
at its origin.
Polarity - The voltage of a conductor relative to another
conductor or the general mass of earth.
Phase rotation - The connection of three-phase conductors that will
ensure three-phase motors run in a determined direction.
Phasing - The identification of active conductors of the same
phase (having no significant angular displacement).
Qualification - A planned combination of learning outcomes that
have a defined purpose.
Shall - Indicates that a statement is mandatory.
Service Line means electricity line (either overhead or
underground) supplying electricity from the overhead or underground network to
the customer’s connection point.
Should - Indicates a recommendation.
Voltage - Differences of potential normally existing between
conductors and between conductors and earth as follows:
(a) Extra-low
voltage Not exceeding 50 V a.c. or
120 V ripple-free d.c.
(b) Low voltage
Exceeding extra-low voltage, but not exceeding 1 000 V a.c. or
1 500 V d.c.
(c) High voltage
Exceeding low voltage
· Lesson 1 Online TestQuestionnaire
Test Link
https://www.classroomclipboard.com/503511/Test/A43C8DDA-5A5A-4DB7-B3A1-C39C754D2126 |
Access Code
YH4YH
· Lesson 2-Carry out Test Procedure
http://www.iqytechnicalcollege.com/Lesson
2 Notes.pdf
· Lesson 2 Online Test Questionnaire
Access c ode
Test Link G4PK
https://www.classroomclipboard.com/503511/Test/CC610EC4-FF28-4BE0-9D52-D1728E6FC31B
· Lesson 3 Complete the test
procedures File
http://www.iqytechnicalcollege.com/Lesson3.pdf
· Low Voltage Proximity Test File
·
LV Proximity Testing
Proximity testing must be conducted:
• on approach to conductive
structures/ enclosures such as meter boxes, PoE enclosures, padmount
substations, conductive poles (see
9.14 Test 12 Pole leakage detection), roof gutters, riser brackets
etc. Conductive elements mounted to
non-conductive poles should also be checked
• after the energisation of
equipment within or connected to the conductive structure/enclosure, or in
the vicinity of equipment that may be energised.
• at conductive structures near to
fallen conductors such as fences and hand rails
Proximity testing is a non-contact, indication only test for the presence
of a hazardous voltage in a
conductive structure or enclosure
prior to physical contact being made by a worker.
The proximity detector is only effective on AC and will indicate a
voltage has been detected when the tip of
the device is placed in the proximity of 50-1000
Volts. The tip should be on or near the object being teste
Phase rotation testing must be carried out
After any network alteration that may alter the order of phase
connections to an installation. Alterations made
on both the HV and LV networks can affect phase
rotation
· Practice- UETTDREL16A - Working safely near live
electrical apparatusLesson
https://www.iqytechnicalcollege.com/Form71ESI.htm#a1
· Completion process of Class 2A Disconnect and
reconnect at connection point unitsLesson
http://www.iqytechnicalcollege.com/UETDRMP011
Mapping.pdf
www.iqytechnicalcollege.com/
Completion
UETTDRRF11A - Testing of connections to low voltage
electricity networks
Complete Lesson 1 Online Test + Lesson 2 Online Test+ Lesson 3 Practical Testing
www.iqytechnicalcollege.com/2A
Testing Skills Practice.pdf
www.iqytechnicalcollege.com/Class
2A Assessment Hard Copy.pdf
www.iqytechnicalcollege.com/UETTDRRF06-TSP01.3-R1.0.pdf
TOPIC 3
UETDRRF004 Perform rescue from a live LV panel
View
the learning support site by clicking HERE
https://www.iqytechnicalcollege.com/Form71ESI.htm#a2
TOPIC 4
View the note
basic-first-aid-revision-notes-pmcpmcr
First_Aid_eBook_v1
first_aid_notes_2019
red-cross-essential-first-aid-guide-english
www.iqytechnicalcollege.com/First_Aid_eBook_v1.pdf
www.iqytechnicalcollege.com/first_aid_notes_2019.pdf
www.iqytechnicalcollege.com/red-cross-essential-first-aid-guide-english.pdf
www.iqyttechnicalcollege.com/basic-first-aid-revision-notes-pmcpmcr.pdf
TOPIC 5
HLTAID009 Provide CPR
Read HLTAID001-Provide-CPR-Learner-Guide and HLTAID009 CPR
and perform the assessment activities in
HLTAID009 CPR
www.iqytechnicalcollege.com/HLTAID009-CPR.pdf
www.iqytechnicalcollege.com/HLTAID001-Provide-CPR-Learner-Guide.pdf
TOPIC 6
Asbestos Awareness
www.iqytechnicalcollege.com/Asbestos
Awareness.pdf
Metering
Qualification
www.iqytechnicalcollege.com/Metering.htm
TOPIC 1. UEEEL0013/ UEEEL0078/UEEENEEG171A
www.iqytechnicalcollege.com/Metering.htm
·
Edit
|
|
Version |
1 (Published
2/15/2024 1:49 AM) |
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/14EEB540-AD88-416A-8776-09EF7ACBAD08 |
Lesson 2 Reader
-Metering Layout and Requirement -Metering-InstallationsFile
http://www.iqytechnicalcollege.com/Metering-Installations.pdf
http://www.iqytechnicalcollege.com/Metering
installations _ NSW Fair Trading.pdf
|
|
Version |
1
(Published 2/15/2024 3:42 AM) |
Access
Links |
|
Test
Link |
https://www.classroomclipboard.com/503511/Test/FFC11A5D-FA40-4FA0-AAFA-89E3D26D30D5 |
http://www.iqytechnicalcollege.com/What
is interval metering.pdf
What are the metering parameters
http://www.iqytechnicalcollege.com/What
are the metering parameters.pdf
Type of meters – Ausgrid
http://www.iqytechnicalcollege.com/Type
of meters - Ausgrid.pdf
SBD9TGE |
|
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/44823CFF-2C0A-4F22-9BDF-8FE0290D6801 |
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/35ED6F7B-6ED0-4554-8CC9-A72CA261303E |
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/ED56CA42-DB7F-47DF-95D2-3D639258BED7 |
2B9E7J |
|
Version |
1 (Published 2/16/2024 1:48 AM) |
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/95D6F139-19A6-4929-A0DE-9769192D01DD |
J7LLGN
Access Links
Test Link
https://www.classroomclipboard.com/503511/Test/963B24DC-D718-4C0D-B2C2-D6D1D0009F0D
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/945CA1BF-831A-4CC2-9286-C078646FA2F6 |
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/B473DEBD-4921-4024-A8B1-1CDC13D2766B |
|
|
Version |
2 (Published
2/16/2024 7:45 PM) |
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/4806A4A5-F32D-4DCC-A3D6-C77A90C69780 |
Single phase
https://www.youtube.com/watch?v=opHtgbcicTk
Three phase
|
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/6EB4ADAD-4E98-4A3C-A9F5-53ADEF0EBD1A |
YYD6H |
|
Access Links |
|
Test Link |
https://www.classroomclipboard.com/503511/Test/4806A4A5-F32D-4DCC-A3D6-C77A90C69780 |
http://www.iqytechnicalcollege.com/Metering
Qualification Competency Mapping.pdf
Metering Skill Practice
www.iqytechnicalcollege.com/Metering
Skill Practice.pdf
Metering Assessment Question
www.iqytechnicalcollege.com/Metering
Topic 1 Assessment Questions.pdf
Add
an activity or resource
·
Edit
Add
an activity or resource
·
Edit
Add
an activity or resource
·
Edit
Add
an activity or resource
·
Edit
Add
an activity or resource
·
Edit
Add
an activity or resource